Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
  • 1980 — 1989
Тяговая подстанция на станции Скривери
In the 1970s, Lengiprotrans developed a traction substation project at Skriveri station in Latvia. Longitudinal and transverse profiles were prepared, external power supply of the facility was...
  • 1970 — 1979
  • 1980 — 1989
Перевод на телеуправление электрифицированного участка Рига — Тукумс
The Riga - Tukums railway line is a section of the Tornakalns - Tukums II electrified line in Latvia. In the period 1976–1980, Lengiprotrans developed a project for transferring the Riga -...
  • 1970 — 1979
  • 1980 — 1989
Перевод на телеуправление электрифицированного участка Рига — Елгава
The Riga - Jelgava railway line is the shortest electrified branch of the Latvian Railway. In the period 1976-1980, Lengiprotrans developed a project for transferring the electrified section...
Pages