Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
Модернизация устройств СЦБ на участке Солонички — Большая Михайловка
Solonichki — Bolshaya Mikhailovka — section of the Kazakhstan railway. In the 1980s, according to the Lengiprotrans project, the modernization of signaling devices on the railway section and...
  • 1980 — 1989
ЭЦ маневрового района парка очистки на станции Экибастуз II
Ekibastuz II - station of the Kazakhstan railway in the area of ​​a large coal deposit. In 1970-1980, within the framework of the construction of railway approaches to the Ekibastuz industrial...
  • 1980 — 1989
ЭЦ станций на участке Байгул — Караджал
Baigul - Karazhal - a section of the Karaganda - Karazhal line of the Kazakhstan railway. In the period 1986–1990 Lengiprotrans developed a project for electrical interlocking (EC) of 3...
  • 1980 — 1989
ЭЦ станций на участке Бата — Карабас
Bata - Karabas is a section of the Kazakhstan railway. In the period 1986–1990 Lengiprotrans developed a project for electrical interlocking (EC) of 5 railway line stations with 21 turnouts...
  • 1980 — 1989
ЭЦ станций на участке Тобол — Джетыгара
Tobol - Dzhetygara is a section of the Kostanay - Dzhetygara railway line of the Kazakhstan railway. The line was designed by Lengiprotrans in the 1950s to transport iron ores from the Sokolovo-...
  • 1980 — 1989
  • 1990 — 1999
Модернизация устройств ЭЦ на станции Рига-Пассажирская
Riga-Passenger is the main railway station in the capital of Latvia. In the 1980s, Lengiprotrans developed a project for the modernization of electrical interlocking devices (EC) for 130...
Pages