Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
  • 1990 — 1999
Реконструкция моста через реку Нарву
The reconstruction of the bridge over the Narva River in the Estonian city of Narva was carried out according to the Lengiprotrans project. Design and survey work began in 1985 when...
  • 1990 — 1999
Пешеходный мост на пересечении улицы Мяэкалда с Октябрьским проспектом в Таллине
In the 1980s, Lengiprotrans developed a project for the construction of a pedestrian bridge at the intersection of Mäekalda Street with Oktyabrsky Avenue in Tallinn. Power supply was also designed...
  • 1980 — 1989
  • 1990 — 1999
Реконструкция автодорожного моста через подводящий канал на автодороге к Эстонской ГРЭС
In the 1980s, Lengiprotrans engineers worked on a project to reconstruct a road bridge across the supply canal on the road to the Estonian State District Power Plant. This project was carried out...
  • 1980 — 1989
  • 1990 — 1999
Путепроводная развязка на пересечении проспекта Кренгольмца с железнодорожными путями МПС
In the 1980s, Lengiprotrans developed a project for an overpass at the intersection of Krengolm Avenue with the railways of the Ministry of Railways in Narva. At the facility, the following...
Pages