Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
  • 2000 — 2009
Автодорожный мост через реку Се-Яха
In the 1980s, Lengiprotrans began developing a project for the Obskaya - Bovanenkovo ​​line, the northernmost railway in the world. The road was intended for the development of the Bovanenkovskoye...
  • 1990 — 1999
Автодорожный мост через реку Индигирка
The bridge over the Indigirka River is designed for 974 km of the reconstructed Magadan-Yakutsk highway in the Republic of Sakha (Yakutia). The length of the structure is 310 m.
  • 1990 — 1999
Автодорожный мост через реку Эльги
The bridge over the Elga River was designed on the reconstructed highway Magadan - Yakutsk in the Republic of Sakha (Yakutia). The length of the structure is 479 m.
  • 1990 — 1999
Автодорожный мост через реку Аллах-Юнь
The bridge over the Allah-Yun River is designed for 190 km of the Eldikan - Yugorenok highway in the Republic of Sakha (Yakutia). The length of the structure is 266 m.
  • 1990 — 1999
Автодорожный мост через реку Кюбюме
The bridge crossing over the Kyubyume River is designed for 321 km of the reconstructed Magadan-Yakutsk highway in the Republic of Sakha (Yakutia). The length of the structure is 182 m.
  • 1990 — 1999
Автодорожный мост через реку Селирикан
The bridge crossing over the Selirikan River was designed on the reconstructed Kobyuma-Selirikan highway in the Republic of Sakha (Yakutia). The length of the structure is 182 m.
Pages