Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1935 — 1939
  • 1940 — 1949
Барнаульский железнодорожный узел
  • 1935 — 1939
  • 1940 — 1949
Читинский железнодорожный узел
The Chita railway junction is a large junction on the Trans-Siberian Railway. In 1935-1941 Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development and reconstruction...
  • 1935 — 1939
  • 1940 — 1949
Иркутский железнодорожный узел
Irkutsk railway junction is a large junction of the East Siberian railway. In the pre-war period Lentransproekt (since 1951 - Lengiprotrans) drew up a project for the development and...
  • 1940 — 1949
  • 1970 — 1979
Вильнюсский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway facilities destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and a...
  • 1940 — 1949
  • 1970 — 1979
Радвилишкский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway infrastructure destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and...
  • 1940 — 1949
  • 1950 — 1959
Генеральная схема развития Ленинградского железнодорожного узла на 1950–1965 годы
For many years, Lengiprotrans has been developing a general scheme for the development of the St. Petersburg (formerly Leningrad) railway junction. In the 1950s, the institute developed a general...
Pages