Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1935 — 1939
  • 1940 — 1949
Красноярский железнодорожный узел
In 1935-1941 Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development of the Krasnoyarsk railway junction. This was due to the construction of the second track. 
  • 1935 — 1939
  • 1940 — 1949
Кировский железнодорожный узел
The Kirov railway junction is located on the northern and new direction of the Trans-Siberian Railway. Passenger and freight traffic of the boiler, Glazov and Kotlas directions passes through it...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Алма-Ата
  • 1940 — 1949
  • 1950 — 1959
Генеральная схема развития Ленинградского железнодорожного узла на 1950–1965 годы
For many years, Lengiprotrans has been developing a general scheme for the development of the St. Petersburg (formerly Leningrad) railway junction. In the 1950s, the institute developed a general...
  • 1940 — 1949
  • 1970 — 1979
Вильнюсский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway facilities destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and a...
  • 1940 — 1949
  • 1970 — 1979
Радвилишкский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway infrastructure destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and...
Pages