Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
  • 1960 — 1969
Генеральная схема развития Бологовского железнодорожного узла
The Bologovsky railway junction is a large transit junction on the main line Moscow - St. Petersburg of the Oktyabrskaya railway. The following directions pass through the junction: Bologoye -...
  • 1960 — 1969
  • 1970 — 1979
Электрификация участка Беломорск — Лоухи — Кандалакша
The Belomorsk - Loukhi - Kandalaksha railway line is part of the Oktyabrskaya railway. The specialists of Lengiprotrans have developed a project for the electrification of this section. The...
  • 1960 — 1969
Железнодорожный транспорт Киришского нефтеперерабатывающего завода
The Kirishi Oil Refinery (Kirishinefteorgsintez) is a large oil refinery in the city of Kirishi, Leningrad Region, founded in 1966. The plant was intended to provide the North-West of Russia...
  • 1950 — 1959
  • 1960 — 1969
Электрификация участка Таллин — Палдиски
Tallinn - Paldiski is a section of the Estonian Railway connecting the capital of Estonia with the port city of Paldiski on the coast of the Gulf of Finland. In the 1950s – 1960s Lengiprotrans...
  • 1960 — 1969
Реконструкция производственной базы СУ-312 треста «Балттранстрой»
In the 1960s, Lengiprotrans developed a project for the reconstruction of the production base of the construction department No. 312 of the Balttranstroy trust in Kaliningrad.
Pages