Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1960 — 1969
Электрификация участка Обухово — Мга — Волховстрой
The Obukhovo - Mga - Volkhovstroy railway line is a section of the Volkhovstroyevsky direction of the Oktyabrskaya railway. The line was electrified according to the Lengiprotrans project as...
  • 1960 — 1969
Электрификация участка Гатчина — Сиверская
The railway line Gatchina - Siverskaya is a section of the Warsaw line of the Oktyabrskaya railway. In 1966, according to the Lengiprotrans project, the line was electrified for direct current...
  • 1950 — 1959
Электрификация участка Васкелово — Сосново
Railway line Vaskelovo - Sosnovo - a section of the Priozersk direction of the Oktyabrskaya railway. The site was electrified under the Lengiprotrans project following the Leningrad (now St....
  • 1970 — 1979
Электрификация участка Мга — Невдубстрой
Mga - Nevdubstroy - nevdubstroy direction of the October railway. The project for the electrification of the line was developed by Lengiprotrans in 1978 as part of the transfer to electric...
  • 1940 — 1949
  • 1950 — 1959
Электрификация участка Кизел — Пермь
Railway line Kizel - Perm - a section of the Sverdlovsk railway. In the late 1940s, Lentransproekt (since 1951 - Lengiprotrans) developed a project for its electrification. During the design,...
Pages