Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
Автоматическая блокировка на участке Карталы — Тобол
Kartaly — Tobol is a railway section providing transport links between Russia and Kazakhstan. Automatic blocking on the line was designed by Lengiprotrans in 1958 during the development of...
  • 1950 — 1959
  • 1960 — 1969
Железнодорожный переход через Каунасский гидроузел в районе г. Каунаса
In the 1950s and later, Lengiprotrans engineers worked on various transport facilities in the Baltics. One of these objects, the railway crossing through the Kaunas hydroelectric complex, was...
  • 1950 — 1959
  • 1960 — 1969
Электровозное депо Карталы
In the 1950s – 1970s, the projects of the former Lengiprotrans Plant Department were related to the post-war restoration of the industry, the development of production capacities of transport...
  • 1950 — 1959
Реконструкция депо Петрозаводск
Locomotive depot Petrozavodsk (TCh-24) is located in the capital of the Republic of Karelia and is part of the Oktyabrskaya railway. It was founded back in 1916. In 1959, a massive replacement of...
  • 1950 — 1959
Внутрипортовые железнодорожные пути в Риге
The Port of Riga is a large ice-free port in the capital of Latvia. Most of the cargo turnover is made up of transit cargo, the main of which are: coal, oil products, timber and container cargo...
  • 1950 — 1959
  • 1960 — 1969
Даугавпилсский завод сборных железобетонных конструкций треста «Балттрансстрой»
In 1950-1970s Lengiprotrans developed a project for the reconstruction of the Daugavpils plant of prefabricated reinforced concrete structures of the "Balttransstroy" trust. In 1980-1987,...
Pages